許延春,男,漢族,中共黨員,河北樂亭人,1963年4月生,現為bevictor伟德官网bevictor伟德官网教授、博導、研究員,任中國煤炭工業協會煤礦防治水專家委員會委員、中國煤炭學會煤礦開采損害技術鑒定委員會委員、中國地質學會礦山水防治與利用專業委員會委員。自1984年從事特殊采煤(近水體安全采煤、煤礦井筒破裂防治和建築物下采煤)方向的研究和教學,主持、主參10多項國家(包括“十五攻關”、“973”、國家自然科學基金)科研課題,近5年以來主持完成12項近水體安全采煤項目和1項井筒破裂防治理項目,科技成果廣泛用于煤礦生産實踐,解決了一系列重大工程技術難題。曾獲國家科技進步獎二等獎1項、省部級科技進步獎11項(一等獎4項,二等獎7項)、國家發明專利1項;出版學術著作5部,參加《建築物、水體、鐵路及主要井巷煤柱留設與壓煤開采規範》(2017年)修編。在Mine Water and the Environment、煤炭學報等國内外重要學術刊物上發表論文60餘篇。
ShortBiosketch of Professor Yanchun Xu
Born in 1963,Yanchun Xureceived his B.E. in mining engineering atXi’an Mining Institute in 1984 and received his M.E. and Ph.D. in mining engineering at China Coal Research Institute in 1992 and 2002. He serves as professor in School of Energy and Mining Engineering at China University of Mining and Technology (Beijing) and supervisor for Ph.D. students. He also serves as member in the committee of mine water control experts of the China National Coal Association, member in the technical appraisal committee of mining damage of the China Coal Society, and member in the committee of mine water prevention and utilization of the China Geological Society.
Xustarted his research and teaching career in special mining from 1984 which includes coal mining near water bodies, prevention of mine shaft failure, and coal mining under buildings.Xuhas presided over and participated in more than 10 national research projects including the 10th Five Years Key Programs, the Program 973, and programs supported by the National Natural Science Foundation of China.In recent 5 years,Xuhas directed12projects on coal mining near water bodies and1projectsonmine-shaft fracture prevention. His research has been widely applied in coal mine production and solved a wide range of engineering problems.Xuhas won 1 second prize in National Science and Technology Progress Awards, 4 first prizes and 7 second prizes in Provincial and Ministerial Science and Technology Progress Awards, and owns 1 national invention patent.Xutook part in the writing and revision of the Pillar Design and Mining Specifications under Buildings, Water, Rails, and Major Roadways (2017) and has published 5 monographs and more than 60 peer-reviewed papers on well-known journals such asMine Water and the EnvironmentandJournal of China Coal Society.Xu’s selected publications are listed below:
XuYC, Du MZ, Luo YQ. Using Water Injection to Prevent Shaft Failure in the Jining No. 3 Coal Mine, China.Mine Water and the Environment, 2019. (Doi: 10.1007/s10230-018-00576-z)
Xu YC, Luo YQ, Li JH, Li KQ, Cao XC. Water andsand inrush during mining under thick unconsolidated layers and thin bedrock in the Zhaogu No. 1 coal mine, China.Mine Water and the Environment, 2018, 37(2): 336-345.
許延春,曹光明,張星宇,端恒,劉世奇.推采陷落柱工作面覆岩異常破壞規律研究.礦業科學學報, 2018,3(03):268-276.
許延春,杜明澤,呂文茂.低壓聯合注水預防井筒破壞工業試驗.礦業科學學報,2017,2(05):459-466.
許延春,謝小鋒,劉世奇,李昆奇,王煥忠.注漿加固工作面底闆岩體力學性質“增強-損傷”的定量測定.采礦與安全工程學報,2017,34(06):1186-1193.
李江華,許延春,董檢平,郭文硯,曹旭初.風化泥岩裂縫湧水及擴展規律模拟試驗研究.煤炭學報,2016,41(04):984-991.
XuYC,LiXD,Jie YX. Test onwaterlevelstabilization andprevention ofmineshaftfailure bymeans ofgroundwaterinjection.Geotechnical Testing Journal,2014,37(2):319-332.
許延春,李見波.注漿加固工作面底闆突水“孔隙-裂隙升降型”力學模型.中國礦業大學學報,2014,43(01):49-55.
許延春,陳新明,李見波,姚依林.大埋深高水壓裂隙岩體巷道底臌突水試驗研究.煤炭學報,2013,38(S1):124-128.
許延春,劉世奇,柳昭星,張旗,王煥忠.近距離厚煤層組工作面覆岩破壞規律實測研究.采礦與安全工程學報,2013,30(04):506-511.
Contact:Dr. Yanchun Xu, Professor
School of Energy and Mining Engineering
China University of Mining and Technology, Beijing
Xueyuan Road D11, Beijing 100083, PR China
Tel: 13681272776
Email: yanchun-xu@163.com